Page not found

Search results

  1. Water Filtration Plant Monthly Reports

    Water Treatment Plant | Page

    A to Z monthly_activity_report_august_2022.pdf CITY OF ST. JOSEPH WATER FILTRATION PLANT OPERATIONAL ... September 30th. ST. JOSEPH WATER FILTRATION PLANT By: Greg Alimenti 1701 LIONS PARK DRIVE St. Joseph Water ... (USACE) 579.82 Min 53.3 ST JOSEPH WATER PLANT PUMPAGE-WATER DELIVERED/RAINFALL AUGUST 2022 Day to Day ...

  2. Water Filtration Plant Monthly Reports for 2021

    Water Treatment Plant | Page

    Z monthly_activity_report_january2021.pdf CITY OF ST. JOSEPH WATER FILTRATION PLANT OPERATIONAL REPORT JANUARY 2021 Mission Statement WSJOB- ... training for the City of St. Joseph and Benton Charter Township water plants. The cost is shared between ... basin influent line and filters 1-4 influent line per EGLE recommendations ST. JOSEPH WATER FILTRATION ...

  3. Lake Boulevard ADA Parking Improvement Project

    Parks & Recreation | Bid/RFP

    City of St. Joseph Lake Boulevard ADA Parking Improvement Project  Sealed bids will be received ... Project AUGUST 2023 PREPARED BY: CITY OF ST. JOSEPH – PUBLIC WORKS DEPARTMENT 700 BROAD ST. ST. JOSEPH ... CITY OF ST. JOSEPH, MICHIGAN LAKE BOULEVARD ADA PARKING IMPROVEMENT PROJECT TABLE OF ARTICLES Page ...

  4. Debt Schedules

    Finance & Utility Billing | Page

    project Number 5647-01 Sewer Revenues Debt Service Report City of St. Joseph 11-2070 As of July 1, 2020 ... Junior Lien Bonds Water Rates Debt Service Report City of St. Joseph 11-2070 As of July 1, 2020 7237-01 ... Service Report City of St. Joseph 11-2070 As of July 1, 2020 5190-01 9/26/2002 Local Unit Name: Local Unit ...

  5. 2017 Coastal Study and Addendums

    City Engineer | Page

    (WIS) for the shoreline near St. Joseph, the 50-year event peak deep water wave height is 7.2 meters, or ... Overview Map City of St. Joseph ● Coastal Engineering Study Update 2017 Page- 3 The project areas included ... jetty of the St. Joseph River to the northern limit of the St. Joseph Water Plant. This area includes ...

  6. 2017 Coast Study and Addenda

    Planning & Zoning | Page

    (WIS) for the shoreline near St. Joseph, the 50-year event peak deep water wave height is 7.2 meters, or ... Overview Map City of St. Joseph ● Coastal Engineering Study Update 2017 Page- 3 The project areas included ... jetty of the St. Joseph River to the northern limit of the St. Joseph Water Plant. This area includes ...

  7. 2020 Preliminary Floodplain Maps

    Planning & Zoning | Page

    City of St. Joseph that the December 19, 2019 Preliminary copies of the revised Flood Insurance Rate ... incorrect and utilized the appeal process by submitting scientific data to the City of St. Joseph, which was ... E E E E E E ZONE AE(EL 584) Bridge 1314 23 24 26 25 27 City of Benton Harbor260032 City of St. Joseph260044 Charter ...

  8. I-94 BL Lead Service Line Replacement Project

    City Engineer | Page

    after normal working hours, call: St. Joseph Water Treatment Plant: Phone: (269) 983-1240 I-94 BL LSLR ... water shutoff as described below. The work will be completed as part of the City of St. Joseph’s “I-94 ...

  9. Notice of Public Meeting

    Water Treatment Plant | Page

    BENTON HARBOR – ST. JOSEPH JOINT WASTEWATER TREATMENT PLANT Producing clean water for the environment 269 ... FLOOD INSURANCE RATE MAP NEAR PROJECT AREA Benton Harbor St. Joseph Joint WWTP SCIP Update 7 APRIL 2023 ... and the river’s banks. The St. Joseph River is approximately 200-ft to the east of the project area. ...

  10. CWSRF Project Planning Agreement

    Joint Waste Water Treatment Board | Bid/RFP

    Due Date:_01/31/24__ Name:______________ Project Overview: The Benton Harbor – St. Joseph Wastewater ... . JOSEPH JOINT WASTEWATER TREATMENT PLANT Producing clean water for the environment 269 Anchors Way – St ... • Hourly Rates BENTON HARBOR – ST. JOSEPH JOINT WASTEWATER TREATMENT PLANT Producing clean water for the ...

Pages