Page not found

Search results

  1. Asset Management Program

    City Engineer | Page

    Stations X X X X 2018 Yes Wallace Avenue Reconstruction X 2018 Yes 2018 Sidewalk & Spot Concrete ... Ave Reconstruction X 2020 Yes 2020 Sidewalk Replacement Project X 2021 No Broad Street LSLR (2018 LCR) ... Ave Napier Ave 61 Lakeview Ave Reconstruction Lakeview Avenue Wallace Avenue West Highland Ave 62 ...

  2. 2017 Asset Management/SAW Grant Information

    City Engineer | Page

     was  available and compiled from previous City projects. A geographical information systems (GIS) file  had been developed for the storm water system as part of a 2010 total maximum daily loading  ... . Wade Trim updated the data using an inventory of available record drawings  and as‐builts completed in the City of St. Joseph. This included infrastructure projects as  well as road reconstruction projects. Project ... systems were located. As part of the project scope, a City of St. Joseph Engineering  Department crew collected the GPS coordinates of the sanitary sewer structures and  ...

  3. 2022 Lead Service Line Replacement (LSLR) Project

    City Engineer | Page

    Line Replacement Project should be directed to Assistant City Engineer Alex Austin, telephone: (269) ... City, Abonmarche, and Pajay, Inc. The reason the project is being undertaken is to comply with the 2018 ... project such as the Langley Avenue Reconstruction in 2021 or the Willa & Lester and Donna ...

  4. 2025 Botham Avenue Reconstruction Project- Request for Proposals

    City Engineer | Bid/RFP

    Avenue Reconstruction Project.  The information submitted, including experience, qualifications, fee ... FOR PROPOSAL: PROFESSIONAL ENGINEERING SERVICES 2025 Botham Avenue Reconstruction Project   CLOSING ... St. Joseph project listed below: 2025 Botham Avenue Reconstruction Project PROFESSIONAL ENGINEERING If ...

  5. Annual City Budget and Capital Improvement Plan

    Finance & Utility Billing | Page

    to account for committed revenue for the necessary projects and capital improvements to City streets ... engineering, or design study related to an individual capital improvement project or to a program that is ... to planning capital projects include the following: Helps to inform residents and stakeholders on how ...

  6. 2016 Master Plan and Documents

    Planning & Zoning | Page

    investments. X City, PC, MDOT, Others Public, Grants Wallace Ave Project incorporates a non-motorized path. ... Proposed Activity for 2017-2018 (2/7/2018) Update: June 2016- June 2017 (7/6/2017) Update March 2021 Image ... June 03, 2021 New Business 1. Public Hearing- City of St. Joseph- Amendment to Article IX Special ...

  7. Upton Drive Reconstruction Project

    City Engineer | Page

    information on the project can be found on the Engineering Department webpage at the following link.  ... https://www.sjcity.com/cityengineer/page/upton-drive-reconstruction-project The project team thanks you for your patience, and please feel free to contact Project Engineer ... General Information The Upton Drive Reconstruction Project is scheduled to begin on March 25, 2024. The ...

  8. Annual Reports

    Planning Commission | Page

    2018 2019 2020 2021 2022 8 • Section 3.10 regarding allowance for stair and landing projections. City ... signs. Planning Commission recommended approval June 2, 2022. City Commission approved first reading June ... Creek, Michigan, one-day event in June 2019. 9. Michigan Association of Planning – State Conference, ...

  9. Dickinson Park

    Parks & Recreation | Page

    Menu Settings Dickinson Park Sort A to Z dickinson_final_master_plan_april_18.pdf PROJECT SHEET Oxford ... ngs Project Profi leProject Components �a� ve Edge, LLC was contracted by the City of Berkly to create ... and Angled Parking on Stadium Drive Parallel Parking on Wallace Avenue Bleachers on concrete pad ...

  10. I-94 BL Lead Service Line Replacement Project

    City Engineer | Page

    located in an area of the City in which a reconstruction project was undertaken prior to the 2018 Lead and ... Information First Call: Alex Austin, P.E., Assistant City Engineer City of St. Joseph 700 Broad Street St. ...

Pages